PLANNING,
DESIGN & OPERATIONS – METALLIFEROUS MINES
Murchison
Zinc Company Pty Ltd – Optimisation Study for Golden
Grove.
Minproc – Consultant Project Engineer undertaking
feasibility studies including mining reserves, scheduling,
conceptual layouts, mine rehabilitation proposals, mine management
structures and costs on alluvial and hard rock/gold mining
projects throughout Australia.
Minproc – Consultant Project Engineer responsible
for the initial site location studies in the Environmental
Impact Statement required for Minproc Holding’s sodium
cyanide plant in Gladstone.
Minproc
– Consultant Project Engineer providing assessment
of the infrastructure requirements for Pancontinental Mining’s
Thalanga and Lady Loretta deposits in Queensland.
Hamersley Iron Pty Limited – Senior Mining
Engineer responsible for long term planning of the Paraburdoo
Orebody including the introduction of the 4 West Deposit,
mine scheduling, mine layout, major new mining equipment recommendations
and project infrastructure.
Minerals Mining and Metallurgy Limited – Surface
Mining Manager responsible for planning, development and operation
of the Blackwoods opencut and ongoing dump treatment operations
including rehabilitation of the surface area of the mine.
Minerals Mining and Metallurgy Limited – Surface
Mining Manager, feasibility studies on Blackwoods Opencut,
and underground projects including development of the Western
Mineralisation in Broken Hill.
North Broken Hill Limited – Mining Engineer,
assisted in the development of the Silver Peak Deposit north
of Broken Hill.
|